Call Centre Expansion, Tuggerah

Client:
City of Newcastle
Sector:
Commercial & Industrial
Project:
Development
Status:
Completed

Our review ensured road safety was maintained while minimising delays for all road users.

A traffic impact assessment and transport management plan were prepared to meet the approval requirements of Wyong Shire Council for the proposed expansion of an existing call centre in the Tuggerah Industrial Precinct. The Transport Management Plan detailed opportunities for staff to utilise existing public transport infrastructure and the local cycling network and included a Green Travel Plan to provide operational measures to support active travel to and from the site. This was able to demonstrate the adequacy of the proposed parking supply to accommodate the changing needs of the site.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec interdum ipsum gravida lectus auctor, ut elementum velit tempor. Vestibulum eu mattis magna. Nunc sit amet elit mattis, ornare libero in, porttitor diam. Integer est lectus, porttitor sed semper ut, pharetra non neque. Vivamus quis tincidunt augue. Quisque sodales justo a maximus elementum. Phasellus vitae quam suscipit, posuere orci a, semper purus.

Transport Impact Assessments
Movement and Place Assessment
Local Area Traffic Management
Expert Witness Services

See more of our projects

H818, Honeysuckle

This project involved an initial Traffic Control Plan (TCP) for the project and then on-going alterations and reviews to ensure safety was maintained as the project evolved.

Tea Gardens, Riverside

The on-going development in Tea Gardens has significantly increased the residential population of this popular sea side area, and our assessment successfully argued for reduced traffic generation rates.

Bathers, Newcastle

The on-going development of the Bathers Way walking track along the coast line in Newcastle has required a review at a number of locations with regard to traffic, parking and pedestrian impacts.